Discover how to prepare for mandatory energy renovation in Switzerland and the steps to follow according to Thierry Schmid.

Part of the guide
Energy renovation
Energy renovation guide: CECB, insulation, subsidies.
Read the full guide
The canton of Vaud is targeting a 60% reduction in CO₂ emissions by 2030.
Here are the main obligations:
| Stage | Average timeframe | Comment |
|---|---|---|
| CECB+ audit | 4 weeks | 3 renovation scenarios proposed |
| External thermal insulation (ITE) | 3-4 months | Up to -50% of losses, subsidy CHF 50-80/m² |
| Generator replacement (heat pump, wood, district heating) | 6-8 weeks | Heat pump authorisation required |
| Installation of rooftop PV panels | 2 weeks | Optimise with battery and self-consumption |
🧾 Taxation: net amounts after subsidy are 100% deductible
"Plan first, renovate next. A well-managed project begins with a clear diagnosis and a long-term vision."
Find our practical articles on the EDIREX blog:
"Guide to renovation subsidies in the canton of Vaud"
"Energy renovation of the building envelope"
"Air-to-water or geothermal: cost and performance comparison"
Are you planning to insulate, change your heating system or install solar panels? Compare quotes from qualified companies on EDIREX.ch and secure your subsidies before the next legal deadlines.
Compare up to 3 free quotes from verified artisans in French-speaking Switzerland. No commitment, response within 48h.